Lean / 6 Sigma
Production Line Overhaul for FMCG Manufacturer
Reduced cycle time by 32% and defect rate by 18% through systematic Lean mapping and kaizen workshops.
✓ 32% faster cycle time
Deliverables
Full deliverables write-up for this project is being prepared and will be added soon.